Livestock complex

Project nameLivestock complex
Industry classificationAgriculture
Basic information about the project
Project essenceIt is planned to build a cattle-breeding complex for 500 young cattle
Project capacityIt is planned to sell beef in live weight in the amount of 272 tons per year.
Consumer market descriptionTrading networks, processing enterprises, the population of the Krasnodar Territory
Object construction term1.00
Competitive advantageThe implemented project will compete primarily with import producers and its distinctive feature will be the naturalness of the product, more affordable price and geographical proximity to the consumer.
Resource availability for project realizationInvestment attractive land
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh2.00
Planned volume of gas consumption (annual), million cubic meters0.00
Planned volume of water consumption (annual), million cubic meters6.30
Degree of project developmentThe business plan is developed, the ground area is generated
Financial estimation of the project
Total cost of the project, mln rubles58.75
Own resources, million rubles.00
Means of regional (municipal) budget, million rubles.00
Previously involved means, million rubles.00
Investment capacity, mln rubles58.75
Conditions of investor participationDirect investments
Form of investments returnMoney
Payback period5.50
Basic indicators of investment project economic efficiency
Net present value (NPV)31.71
Simple payback time5.50
Discounted payback period6.75
Internal rate of return (IRR)1.49
Productivity index (PI)10.88
Income per year 37.68
Social efficiency of investment project
Number of workplaces35
Salary average level (thousand rub per year)277.03
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles8.88
which includes into consolidated budget of the krai, million rubles3.89
General information about the ground area
Address of the areaThe Kurganinsky district, the village Severniy, the territory of the former dairy farm No. 1
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:16:0301000
Declared area (m2)146000.00
Limit size of the area (m2)146000.00
Land categoryAgricultural land use
Kind of allowed useAgricultural activity
Actual useFree from construction
Availability of buildings, structures, constructionsno
Permits, town-planning documentation"The General plan of Petropavlovsk rural settlements of the Kurganinsky district " approved by the decision of Sovet Petropavlovskogo selskogo poseleniya Kurganinsky district of Krasnodar territory from July 7, 2011 No. 27
Information about proprietor (right holder)
ProprietorState property
Right holderNo data available
Kind of rightRent
Information about encumbrance and limitation
Kind of encumbrance, limitationno
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)Location on
Power supply center (electrotension class)Another
Power supply center (free power (MWt)).00
Power supply center (distance(m)).00
Nearest connection point (network tension, kV).00
Nearest connection point (distance(m)).00
Gas-supplying
Gas pipeline (diameter(mm)).00
Gas pipeline (carrying capacity(cube. m.in a year)).00
Gas pipeline (distance(m)).00
Nearest connection point (diameter(mm)).00
Nearest connection point (carrying capacity (cubic meter a year)).00
Water-supply
Water supply source (name, right-holder)Installation of the tower Rozhnovskogo VBR-50 m3.
Water supply source (power (cubic meters a day))50.00
Water supply source (quality of water)Service water
Water supply source (distance(m)).00
Nearest connection point (power (cubic meters a day)).00
Nearest connection point (diameter(mm)).00
Nearest connection point (distance(m)).00
Sewage system
Type of building (name, right-holder)Local treatment facilities
Type of building (power (cubic meters a day)).00
Type of building (distance(m)).00
Nearest point of connection (power (cubic meters a day)).00
Nearest point of connection (diameter(mm)).00
Nearest point of connection (distance(m)).00
Installation of telephones/internet
Central network (distance(m)).00
Mobile communication (distance(m)).00
Rated price of the ground area supplying with engineering, mln.rub1.90
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Kurganinsk town33.00
nearest settlement village Severniy0.35
Center of federal subject Krasnodar city152.00
highways (regional, federal value) Ust-Labinsk-Labinsk-Upornaya7.20
highways of local value  .00
nearest railway station station Kurgannaya26.00
nearest railway Armavir-Tuapse27.00
airport Krasnodar airport140.00
seaport seaport Tuapse298.00
Additional information about the ground area
Special conditionsAir temperature: annual average - + 10.40С; Min. -320C; Max. - + 420C Main wind direction: east and north-east. Seismicity of the area: 7 points. Depth of soil freezing: 0,8 m. Depth of occurrence of groundwater: to depth
Cost of rent/buy of the ground area, mln. rub0.07
Geographical coordinates of object (dd.dddddd)
Latitude (N)44.118796
Longitude (E)40.520877
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameadministration municipal formation Kurganinskii area
Postal address352430, Krasnodar territory, Kurganinsk, street Lenina, 27
Sitewww. admkurganinsk. ru
Phone/fax8(86147) 2-13-31
E-mail addresskurganinsk@mo.krasnodar.ru
Data about the applicant (executive authority/local government executive authority)
Nameadministration municipal formation Kurganinskii area
Postal address352430, Krasnodar territory, Kurganinsk, street Lenina, 27
Sitewww. admkurganinsk. ru
Phone/fax8(86147) 2-13-31
E-mail addresskurganinsk@mo.krasnodar.ru
Executive (Full name, work position, phone number)the manager of sector of investments, department of economic development, investments and the consumer sphere of administration of municipality the Kurganinsky area – Razumeeva Elena Viktorovna, tel/fax 8(86147) 2 73 11

Links